

May 25, 2026 · 8:50 AM
Burj Khalifa: How Engineers Pumped Concrete 606 Metres Into the Sky to Build the World's Tallest Tower
In the 50°C Dubai heat, 12,000 workers poured 330,000 m³ of ice-chilled concrete, broke the world record for pumping it 606 metres high, and recycled Cold War–era steel from East Berlin — only to rename the finished tower after an Abu Dhabi sheikh who bailed out the project with $25 billion.
More from this channel
- The Parthenon: How Ancient Greeks Built a Perfect Temple Using Optical Illusions and Zero Mortar
- Angkor Wat: How the Khmer Empire Carved 10 Million Blocks to Build the World's Largest Temple
- Hagia Sophia: How Justinian Built the World's Greatest Dome in Just 5 Years
- The Dome That Shouldn't Exist: How Rome Built the Pantheon
- The Eiffel Tower: How Gustave Eiffel Built the World's Most Controversial Iron Tower in 793 Days
- Sydney Opera House: How a Mathematical Breakthrough Turned an 'Impossible' Roof into an Icon
- Sagrada Família: How Gaudí's Dream Became the World's Longest Construction Project
- The Great Wall of China: How 300,000 Workers Built History's Longest Fortress
Related content
- Sign in to comment.
